Experience & Results

Mandalong Bin Construction
Overview: Underground Bin at Mandalong Colliery for splitting coal feed to two different power stations.
Role: Mechanical Engineer.
Achievements:
- Continuous Miner Contract Drivage to get to bin location
- Roadheader Stone drivage to create tunnel between coal seams
- Raise-bore Ventilation shaft
- Drill and blast 8m diameter shaft
- Install one of a kind concrete ring-beam to support the steel bin assembly
- Oversee assembly manufacture and installation
- Commission
Impact: This project allowed the mine to regulate the flow of Coal to 2 different locations. Sounds simple, however the award winning design was completed by the team with incredible engineering and accuracy for such a difficult underground construction.