Experience & Results

A crane lowering a large steel dome component into the concrete foundation of the shaft

Mandalong Bin Construction

Overview: Underground Bin at Mandalong Colliery for splitting coal feed to two different power stations.

Role: Mechanical Engineer.

Achievements:

  • Continuous Miner Contract Drivage to get to bin location
  • Roadheader Stone drivage to create tunnel between coal seams
  • Raise-bore Ventilation shaft
  • Drill and blast 8m diameter shaft
  • Install one of a kind concrete ring-beam to support the steel bin assembly
  • Oversee assembly manufacture and installation
  • Commission

Impact: This project allowed the mine to regulate the flow of Coal to 2 different locations. Sounds simple, however the award winning design was completed by the team with incredible engineering and accuracy for such a difficult underground construction.

A man in a high-visibility vest inside a large prefabricated concrete pipe section

Explore Collaborations with Stephen Brownell

Interested in learning more about Stephen Brownell’s projects or how he can contribute to your organisation’s success? Contact Stephen today to discuss collaborations or consulting opportunities.

Contact Stephen